Storage and Maintenance Facility
- daniellaNZTS
- Mar 8
- 2 min read
Updated: Mar 12
NGK Warehouse Project: Rapidly Installed Light Industrial Building for Storage & Maintenance
When NGK required a high-performance storage and maintenance facility with an extremely tight installation timeline, this Cargo Structure was built and fully operational in just 9 days. This project demonstrated the efficiency and adaptability of lightweight industrial structures, providing NGK with a secure, weather-resistant, and functional industrial space in record time.

Project Overview
Location: NGK site car park
Structure Dimensions: 15m x 25m x 5.3m
Installation Time: 9 days
Primary Use: Storage and maintenance facility

Key Features & Customisations
Thermo Roof & Pump System – Provides insulation and climate control, ensuring optimal temperature regulation within the facility.
Heavy-Duty Vertical Mount Steel Hardware – Enhances stability and ensures long-term durability.
Insulated Fire Wall & Gable – Installed at the rear and in the first two bays, improving fire safety and thermal efficiency.
Automated Roller Doors (x2) – Seamless access for equipment and vehicle entry, increasing workflow efficiency.
Personal Access Door (x1) – Easy entry and exit for personnel.
Rain Guttering System – Protects the structure from water damage and ensures effective drainage.

Project Success
This light industrial building was installed directly onto NGK’s existing car park, demonstrating the flexibility of modular storage buildings to be adapted to available spaces without extensive site preparation. The Cargo Structure’s rapid installation, combined with its high-performance insulation and security features, made it an ideal solution for NGK’s needs.
This project underscores the capability of modular lightweight industrial structures to be custom-built, quickly deployed, and fully operational in minimal time—without sacrificing durability or functionality.
Want this? Contact NZ Temporary Structures today.